Cu COPPER · 69 CORRIDORS MAPPED · FEOC GATE LIVE Li LITHIUM · DRC/CHILE/AUS · SUPPLY CONSTRAINED ▲ RISK Co COBALT · 70% DRC ORIGIN · FEOC EXPOSURE ⚠ CONDITIONAL Ga GALLIUM · MOFCOM EXPORT BAN ACTIVE · SEMI FAB IMPACT ▼ CRITICAL Ge GERMANIUM · MOFCOM EXPORT CONTROLS · CORRIDOR RISK ▼ HIGH Nd NEODYMIUM · REE · CHINA 85% REFINERY · MOTOR/WIND Dy DYSPROSIUM · REE · SUPPLY GAP PROJECTED 2026 In INDIUM · ITO DISPLAYS · PRICE PRESSURE ACTIVE Ta TANTALUM · CAPACITORS · DRC CONFLICT MINERAL FLAG W TUNGSTEN · CUTTING TOOLS/CHIPS · CHINA 80% SUPPLY Ni NICKEL · BATTERY CATHODES · INDONESIA SURGE FEOC TFM — CONDITIONAL ⚠ · CMOC 80% JV · IRA 30D RISK FEOC KAMOA-KAKULA — CONDITIONAL ⚠ · ZIJIN 39.6% JV CIS CI-001 ARIZONA · 68.8/100 · COMPUTED 01:00 UTC P102 SECTION 232 · 50% COPPER TARIFF · LPT +5 WKS GAP 4,000 KT COPPER DEFICIT PROJECTED BY 2030 · S&P GLOBAL ECS MESA DC · 64.2/100 · GRID INTERCONNECT QUEUE 340MW MORENCI PASS ✓ · 454 KT/YR · QTI QL3 · FREEPORT-MCMORAN REE PRASEODYMIUM · MAGNETS · WIND TURBINE · SUPPLY TIGHT ALERT KASUMBALESA CHOKEPOINT · SCORE ≥60 · TIER 1 ACTIVE
SOVEREIGN MINERAL INTELLIGENCE · PREMON INC.

The AI Race Runs on Critical Minerals.

Every GPU. Every data centre. Every semiconductor fab.
Dependent on copper, lithium, cobalt, gallium, REEs — tracked by no one.

We built the only system that connects them — mine to machine.

0 Graph Nodes
0 Relationships
68.8 CIS Score · Live
69 Corridors Mapped
113 Policy Instruments
$5–6M Replacement
Cost Floor
18mo Competitive
Lead Time
10 Trade
Secrets
PC-2+5 Patent
Candidates
0 Direct
Competitors
$4.8B Total
Addressable Market
Intelligence Assessment

Three Compounding Crises.
Zero Intelligence.

Every crisis makes the others worse. Capital is being destroyed right now because no platform connects the dots.

CRISIS 01 · SUPPLY CHAIN

The Supply Chain Is Invisible

No product connects copper from mine to data centre. COMEX headline inventory ≠ available copper. OEM-committed supply is structurally different from exchange inventory. AI capex is being decided without mineral supply intelligence.

$42.48B deployed blind in Arizona AI corridor
CRISIS 02 · GEOPOLITICAL

Geopolitical Risk Is Unpriced

70% of cobalt from FEOC-designated DRC. Section 232 tariff adds 5 weeks per LPT transformer. MOFCOM bans on gallium and germanium directly constrain semiconductor fabrication. No real-time policy-to-asset intelligence exists.

4,000 Kt copper supply gap projected by 2030
CRISIS 03 · CAPITAL

Capital Is Flying Blind

GIP, Brookfield, and BlackRock are committing billions to AI infrastructure without mine-to-machine visibility. IRA FEOC compliance creates stranded capital risk. No sovereign-grade supply chain intelligence product exists at any price.

Cu × SOX correlation r = 0.61 · 18-month lag · unpriced
Critical Materials Coverage

Every AI-Critical Material.
Mine to Machine.

Starting with copper — the backbone of AI compute. Scaling to every critical mineral and rare earth element that determines who wins the AI race.

Copper · Supply Gap Cobalt · FEOC Risk Lithium · Constrained Gallium · Export Banned Germanium · Export Banned Neodymium · REE Dysprosium · REE Praseodymium · REE Nickel · Monitored Tantalum · Conflict Tungsten · China 80% Indium · Price Pressure Manganese · Battery Platinum Group · Monitored Tin · Conflict Mineral Silicon · Semiconductor
COPPER_FLOW™ · Verified Traversal

Mine to Machine.
27 Steps. Every Hop Scored.

The only system that executes a verified traversal from a copper mine through a semiconductor fab to an AI data centre. In three hops.

Stage A–B
Mine · Refinery · Smelter
24 active mines · 21.9% global Cu · QTI QL3 on Freeport assets · 454 Kt/yr Morenci
Stage C
Wafer · Foundry · OSAT
TSMC N2 · 3,200mg Cu/wafer · CoWoS packaging · 45mg/pkg
Stage D
LPT · Grid · Data Centre
340MW WECC queue · LPT +5 wks P102 tariff · Energization-to-Compute™
Stage E
GPU · Training · Inference
B200 · 511mg Cu total · Cu × FLOP cost r = −0.44 · Unpriced by markets
SCORED OUTPUT
CIS · FEOC · QTI · ECS
68.8/100 CI-001 Arizona · 25 FEOC determinations · 22,056+ edges live
MINT INVESTOR TERMINAL · CI-001 ARIZONA · LIVE
Corridor Investment Score · MERV Computed
68.8 / 100

SUPPLY SECURITY83.4HIGH ▲
POLICY STABILITY58.5MOD —
ENERGY INTEL64.2HIGH —
ESG / QTI66.0HIGH —
CAPITAL FLOW92.0CRIT ▲
INFRASTRUCTURE72.0HIGH —

⚠ FEOC STATUS: 2 CONDITIONAL — TFM (CMOC 80%) · KAMOA-KAKULA (ZIJIN 39.6%)
P102 TARIFFLPT +5 WEEKS → ECS IMPACT
COPPER SUPPLY6,345 Kt/yr · 24 MINES

Cu × SOX r=0.61 (18mo lag) · Cu × FLOP Cost r=−0.44 · Computed 01:00 UTC
Mine-to-Machine Graph
2,931+ nodes. 22,056+ relationships. Morenci → TSMC N2 → CoWoS → B200 → Mesa DC in 3 hops. Only graph of its kind in any commercial platform.
Live Intelligence Engines
5 engines computing nightly from EIA, World Bank WGI, WRI Aqueduct, OFAC, SEC EDGAR. 8 automated jobs. Platform runs itself every night.
FEOC Compliance Gate
25 FEOC determinations. OFAC screening of 36,228 entries nightly. IRA 30D compliance built into every data write. Human-in-the-loop 72hr gate.
Sovereign IP Stack
OWL 2 DL ontology · SHACL validation · SWRL inference · PC-2 + PC-5 patents pending · Copyright Bundle 1 timestamped April 19 2026.
The Inventory Paradox
$42.48B

Deployed into the Arizona AI corridor

Without mine-to-machine mineral supply intelligence. Every dollar dependent on a copper supply chain that no institution can currently see, score, or stress-test.

COMEX Headline Inventory
534,000
tonnes · what Wall Street sees
Available Copper (OEM-adjusted)
~180,000
tonnes · what actually matters

The Inventory Paradox: OEM-committed copper is structurally different from exchange-held inventory. No market participant currently prices this gap. MINT does.

Geopolitical Intelligence

Supply Chain Chokepoints.
Scored. Live. Nightly.

Every critical minerals corridor passes through chokepoints that can shut down AI compute overnight. No other platform monitors them.

Kasumbalesa Corridor
TIER 1 CRITICAL — Score ≥60
DRC–Zambia border. Primary cobalt and copper export route. 70% of global cobalt flows through this corridor. CMOC and Zijin ownership concentration triggers dual FEOC flags.
Co · Cu · FEOC CONDITIONAL ⚠
Strait of Hormuz
TIER 1 CRITICAL — Dual Chokepoint
20% of global oil + critical minerals transit. UAE and Gulf State mineral processing. Disruption cascades into energy costs for AI data centres within 72 hours via EIE engine.
Cu · Ni · Al · Energy Infrastructure
Strait of Malacca
TIER 2 HIGH — Single Chokepoint
Southeast Asia rare earth and semiconductor material transit. TSMC supply chain exposure. Indonesia nickel exports critical for battery cathodes. 80% of SE Asia trade flows here.
REE · Ni · Sn · TSMC Exposure
Phoenix / El Mirage DC Cluster
TIER 2 HIGH — Energization Risk
$42.48B AI campus buildout. LPT lead time 65–70 weeks under P102 Section 232. $421M compounding delay at El Mirage. WECC 340MW interconnect queue. PC-5 patent covers this intelligence.
Cu · LPT · Grid · ECS Score: 64.2
Platform Operations · UTC

The Platform Runs Itself.
Every Night. Automatically.

8 automated intelligence jobs. Zero manual intervention. This is what a production system looks like.

1:00 AM engine_compute.py QTI scores · EIE from EIA · GeoMinSec from WGI · IMEV from WRI Aqueduct · MERV CIS composite 68.8 LIVE
1:30 AM owl_bridge.py SWRL R01–R05 via HermiT OWL reasoner · 22 edges inferred · OWL consistency check LIVE
2:00 AM ofac_screen.py 36,228 OFAC SDN entries screened · Levenshtein fuzzy match · 0 hits current graph LIVE
2:30 AM opensanctions.py OpenSanctions REST API · 34 corporate entities screened · match score >0.8 triggers review LIVE
3:00 AM bis_entity_list.py 3,252 BIS Entity List entries · rapidfuzz token sort · 8 near-misses logged · 0 hits LIVE
3:00 AM eia_grid.py EIA API v2 · WECC Arizona grid · renewablePenetrationPct updates EIE engine score LIVE
4:00 AM disruption_alerts.py Chokepoint delta detection · Tier 1 (dual ≥60) webhook · Tier 2 dashboard · Tier 3 logged LIVE
5:00 AM qsc500_index.py CIS × QTI × ECS ranking · QSC500Rank written to graph · GET /index/qsc500 updated LIVE
Intelligence Access · G-Group Tiers

Who Cannot Afford
to Miss This.

Four buyer types. Four distinct crises. One platform. The question is not whether you need this intelligence — the question is whether your adversary gets it first.

G1 · G3 · Defense & Intelligence

The DoD Procurement Officer · DARPA · DIU

FEOC-designated supply chains are embedded in every weapons system, every satellite, every AI-enabled platform. Section 232 and CHIPS Act compliance requires mine-to-machine visibility. Your adversaries are mapping this. You are not.

FEOC gate · Adversary ownership detection · CHIPS Act compliance · IRA 30D · $500K–$2M ACV
G5 · G10 · Institutional Capital

The Infrastructure Fund Manager · SWF · PE

You have committed billions to AI infrastructure. You have no visibility into the mineral supply chains those investments depend on. The Cu × SOX correlation has an 18-month lag. You are pricing the wrong risk.

CIS score · Cu × SOX trading signal · FEOC stranded capital risk · Disruption alerts · $250K–$500K ACV
G9 · Hyperscalers · Semiconductor

The Hyperscaler CTO · TSMC · NVIDIA

Your GPU roadmap depends on copper you cannot track. The Energization-to-Compute™ timeline — from mine to data centre commissioning — is 65–70 weeks under current tariffs. You are planning to timelines that are not real.

Energization-to-Compute™ · Inventory Paradox · LPT delay intelligence · COPPER_FLOW™ API · $50K–$250K ACV
G7 · G6 · Development Finance

The Sovereign Wealth Fund · DFC · World Bank IFC

You are deploying capital into mineral-rich nations without corridor bankability scoring. FPIC compliance, CRMA, Battery Regulation, CSDDD — your portfolio has undisclosed exposure across 113 policy instruments.

Corridor bankability · MSP eligibility · CRMA/CSDDD mapping · FPIC protocol · $250K–$500K ACV
Threat Window · Intelligence Assessment

Four Converging Forces.
Window Is 18 Months.

Miss this window and a well-capitalised competitor owns the intelligence layer. The forces are already in motion.

AUGUST 2025 · ACTIVE

P102 Section 232 Copper Tariff

50% tariff on copper imports. LPT lead time extended to 65–70 weeks. $421M compounding delay at El Mirage AI campus alone. The Energization-to-Compute™ Timeline is now a national security document. PC-5 patent pending.

2025–2026 · ACCELERATING

WECC AI Buildout — $42.48B Deployed

TSMC Fab 21 online. Apple, Google, Meta, Microsoft, Amazon all building in Arizona. 340MW interconnect queue. $42.48B capital deployed. Zero mine-to-machine intelligence layer exists at any institution.

NOVEMBER 2025 · REGULATORY INFLECTION

Copper Added to USGS Critical Minerals List

First time in American history copper is classified as a critical mineral. Triggers IRA 30D FEOC compliance rules, DPA Title III priority manufacturing designation, and MSP eligibility. Structural regulatory shift — not a news cycle.

BY 2030 · STRUCTURAL

4,000 Kt Copper Supply Gap

S&P Global projects a 4,000 Kt copper deficit by 2030, growing to 10,000 Kt by 2040. 61 new mines required. AI demand is the accelerant. This is not a commodity cycle. It is a structural civilisational constraint on compute growth.

Category Ownership Window Closes In
--
Days
:
--
Hours
:
--
Minutes
:
--
Seconds
After this window, the category is owned. First-mover advantage in sovereign-grade mineral intelligence does not reset.
Intellectual Property · Moat Assessment

10 Trade Secrets. 5 Patent Candidates.
2 Copyright Bundles.

You cannot acquire an ontology. You have to build one. That takes domain knowledge that took years to accumulate.

TS-1 · TRADE SECRET
CIS Weighting Formula
Six sub-component weights sealed in ENV:CIS_WEIGHT_*. Never in code. Never in API output. Sealed trade secret under DTSA 18 U.S.C. §1836.
SEALED
TS-7 · TRADE SECRET
Dual-Enum Classification
supply_type × copper_status 5×5 matrix resolving the Inventory Paradox. The architectural insight that no competitor has mapped.
SEALED
TS-8 · TRADE SECRET
DUAL_ROLE_FLAG Algorithm
Single-entity chokepoint detection. The Mercuria Pattern. Identifies when the same corporate entity controls both supply source and transport chokepoint. Not in ontology.
SEALED
PC-2 · PATENT CANDIDATE
SWRL Supply Chain Inference
Using OWL/SWRL rules to infer mine-to-concentrator-to-smelter supply chain paths. Rules R01+R02. Novel application of formal logic to physical supply chains.
FILING IN PROGRESS
PC-5 · PATENT CANDIDATE
Energization-to-Compute™ Timeline
Five-step chain: copper mine → LPT procurement → grid energization → commissioning → AI compute delivery. SWRL-R05. The intelligence layer no DoD analyst has.
URGENT — FILE BEFORE DEMO
DISCOVERY · ZERO LITERATURE
Cu × SOX · Cu × FLOP Correlations
Copper × semiconductor index r = 0.61 with 18-month lag. Copper × NVIDIA FLOP cost r = −0.44. Zero academic literature coverage. These are new trading signals.
TIMESTAMPED APR 19 2026
Intelligence Clearance

Access Is Not Automatic.
Neither Is Winning the AI Race.

Intelligence this precise is not public. It is not free. And it does not go to everyone.

Request Intelligence Clearance

We evaluate all clearance requests within 48 hours. Approved organisations receive a personalised intelligence briefing and MINT platform access proposal.

By requesting clearance you acknowledge this briefing is governed by NDA §3/§17. Premon Inc. reserves the right to decline access. Not an offer to sell securities.

⚠ DISRUPTION ALERT · TIER 2
Kasumbalesa corridor chokepoint score crossed threshold. Cobalt supply chain impact detected. CI-001 Arizona ECS recalculating.